  1. Date: Thu,  4 Feb 93 05:11:55    
  2. From: Space Digest maintainer <digests@isu.isunet.edu>
  3. Reply-To: Space-request@isu.isunet.edu
  4. Subject: Space Digest V16 #124
  5. To: Space Digest Readers
  6. Precedence: bulk
  7.  
  8.  
  9. Space Digest                Thu,  4 Feb 93       Volume 16 : Issue 124
  10.  
  11. Today's Topics:
  12.                     Advanced Solid Rocket Program
  13.           An 'agitator' replies (was: Clinton's Promises...)
  14.          extreme responses to Challenger transcript (3 msgs)
  15.                             Gps Satellites
  16.                      IRAS - 10 Years Ago (2 msgs)
  17.                    material properties of alu 2219
  18.                              Polar Orbit
  19.                  Space Station Media Handbook - 7/18
  20.                 Today in 1986-Remember the Challenger
  21.  
  22.     Welcome to the Space Digest!!  Please send your messages to
  23.     "space@isu.isunet.edu", and (un)subscription requests of the form
  24.     "Subscribe Space <your name>" to one of these addresses: listserv@uga
  25.     (BITNET), rice::boyle (SPAN/NSInet), utadnx::utspan::rice::boyle
  26.     (THENET), or space-REQUEST@isu.isunet.edu (Internet).
  27. ----------------------------------------------------------------------
  28.  
  29. Date: Wed,  3 Feb 1993 10:45:41 -0500 
  30. From: Lawrence Curcio <lc2b+@andrew.cmu.edu>
  31. Subject: Advanced Solid Rocket Program
  32. Newsgroups: sci.space
  33.  
  34. I just got my monthly copy of the GAO's _Reports and Testimony_. They
  35. have a (characteristically unfavorable) review of the Advanced Solid
  36. Rocket Program.
  37.  
  38. OK. I thought that solid rockets were politically out. Now it seems we
  39. are developing solid boosters that will take the shuttle into orbit by
  40. themselves (have I got that right?) So tell me - how do you get a thrust
  41. profile out of solid propellant rockets that won't squash the astronauts
  42. or burn up the vehicle in the lower atmosphere? How do you get
  43. sufficient throttling on the suckers to make them controllable in such a
  44. mission? How big are these puppies going to be? Any other good stuff? If
  45. you have any more liesure, what about HCl pollution and Al2O3 dust?
  46.  
  47. BTW Don't get me wrong - as a model (flying but not homemade) rocket
  48. enthusiast, I *LIKE* solid propellant rockets. At the age of 45, though,
  49. I don't let my propeller beanie interfere with my cynicism.
  50.  
  51. Regards,
  52. -Larry C. 
  53.  
  54. ------------------------------
  55.  
  56. Date: 3 Feb 93 10:29:45 EST
  57. From: "John F. Woods" <jfw@ksr.com>
  58. Subject: An 'agitator' replies (was: Clinton's Promises...)
  59. Newsgroups: sci.space
  60.  
  61. aws@iti.org (Allen W. Sherzer) writes:
  62. >>They've been stuck at a low level of activity...
  63. >I look at their launch manifests and then look at ours. I think we are the
  64. >ones stuck at the low level of activity.
  65.  
  66. But they *are* stuck at a low level of activity.  One launch a *day* is hardly
  67. interesting!  Of course, *we* are stuck at statistically NO level of
  68. activity...
  69.  
  70. >>>Let me get this straight, our system costs ten times as much as theirs
  71. >>>and only gives 20% of the time in space. Yet you think it is more advanced?
  72. >>Yes, because we're the ones developing the upcoming generations of space 
  73. >>transport.  
  74. >Like what?
  75.  
  76. I believe he means the giant conveyor belt planned to transport money to
  77. "space" contractors that never build space hardware.  Note that in this
  78. key technological field, the US program is, indeed unequalled in the world.
  79.  
  80. ------------------------------
  81.  
  82. Date: Wed, 3 Feb 1993 14:36:52 GMT
  83. From: "Carl M. Kadie" <kadie@cs.uiuc.edu>
  84. Subject: extreme responses to Challenger transcript
  85. Newsgroups: sci.space,sci.astro,alt.privacy,comp.org.eff.talk
  86.  
  87. tarl@coyoacan.sw.stratus.com (Tarl Neustaedter) writes:
  88.  
  89. [...]
  90. >Had you simply posted that fabricated transcript, you would have been
  91. >flamed for posting something inappropriate and frankly libelious (yes,
  92. >you accuse NASA of a coverup. That's libelious). And it would have ended.
  93. [...]
  94.  
  95. There is no such a crime as libel against the government (i.e.
  96. seditious libel) in the U.S. anymore.
  97.  
  98. - Carl
  99.  
  100. -- 
  101. Carl Kadie -- I do not represent any organization; this is just me.
  102.  = kadie@cs.uiuc.edu =
  103.  
  104. ------------------------------
  105.  
  106. Date: Wed, 3 Feb 1993 15:14:31 GMT
  107. From: hathaway@stsci.edu
  108. Subject: extreme responses to Challenger transcript
  109. Newsgroups: sci.space,sci.astro,comp.org.eff.talk
  110.  
  111. In article <1knhm2INNfti@transfer.stratus.com>, tarl@coyoacan.sw.stratus.com (Tarl Neustaedter) writes:
  112. > In article <1993Feb3.021308.6018@fuug.fi> an8785@anon.penet.fi (Tesuji) writes:
  113. >>It has been amusing to see the extreme responses to the posting of the
  114. >>Challenger transcript; the burghers with their torches are storming the
  115. >>castle again.
  116. > Had you simply posted that fabricated transcript, you would have been
  117. > flamed for posting something inappropriate and frankly libelious (yes,
  118. > you accuse NASA of a coverup. That's libelious). And it would have ended.
  119. > The extreme reactions come from the fact that you don't have the BALLS
  120.                                                                    ^^^^^
  121. Hey, the poster _could_ be a woman or a eunuch.  Some of us find the 
  122. equating of courage with testosterone to be offensive.  GUTS doesn't 
  123. cut it either (guts = intestines => internal testicles).  But don't 
  124. let offensiveness stop you (or anyone else) from posting whatever you
  125. care to.  While I too had personal reasons to be pained by the tasteless 
  126. posting, the poster's lack of humanity and courage does not diminish _mine_. 
  127. And your example of sexism provides me a welcome opportunity to combat such. 
  128.  
  129. Wm. Hathaway 
  130.  
  131. > to even post it under your own name, you feel you have to hide behind
  132. > an anonymous posting service.
  133. > Go away, squirm back under the rock you crawled out of. And kindly don't
  134. > bother those of us who find skulking in the shawdows to be offensive.
  135. > -- 
  136. >          Tarl Neustaedter    tarl@sw.stratus.com
  137. >          Marlboro, Mass.    Stratus Computer
  138. > Disclaimer: My employer is not responsible for my opinions.
  139.  
  140. ------------------------------
  141.  
  142. Date: Wed, 3 Feb 1993 16:21:58 GMT
  143. From: Mary Shafer <shafer@rigel.dfrf.nasa.gov>
  144. Subject: extreme responses to Challenger transcript
  145. Newsgroups: sci.space,sci.astro,comp.org.eff.talk
  146.  
  147. On Wed, 3 Feb 1993 15:14:31 GMT, hathaway@stsci.edu said:
  148.  
  149. WH> In article <1knhm2INNfti@transfer.stratus.com>, tarl@coyoacan.sw.stratus.com (Tarl Neustaedter) writes:
  150. > In article <1993Feb3.021308.6018@fuug.fi> an8785@anon.penet.fi (Tesuji) writes:
  151. >>It has been amusing to see the extreme responses to the posting of the
  152. >>Challenger transcript; the burghers with their torches are storming the
  153. >>castle again.
  154. > Had you simply posted that fabricated transcript, you would have been
  155. > flamed for posting something inappropriate and frankly libelious (yes,
  156. > you accuse NASA of a coverup. That's libelious). And it would have ended.
  157. > The extreme reactions come from the fact that you don't have the BALLS
  158. WH>                                                                    ^^^^^
  159. WH> Hey, the poster _could_ be a woman or a eunuch.  
  160.  
  161. Some women have balls.  
  162.  
  163. And most of us can tell the difference between metaphor and anatomy.
  164.  
  165. WH> Some of us find the 
  166. WH> equating of courage with testosterone to be offensive.  GUTS doesn't 
  167. WH> cut it either (guts = intestines => internal testicles).  
  168.  
  169. By that logic, GUTS = OVARIES.  That has some interesting implications
  170. in the digestive process.
  171.  
  172. For what it's worth, women manufacture testosterone, just as men
  173. manufacture estrogen.  The relative quantities vary, of course.
  174.  
  175. --
  176. Mary Shafer  DoD #0362 KotFR NASA Dryden Flight Research Facility, Edwards, CA
  177. shafer@rigel.dfrf.nasa.gov                    Of course I don't speak for NASA
  178.  "A MiG at your six is better than no MiG at all."  Unknown US fighter pilot
  179.  
  180. ------------------------------
  181.  
  182. Date: Wed, 3 Feb 93 22:14:34 CET
  183. From: Gianni Piccoli <MC1275@mclink.it>
  184. Subject: Gps Satellites
  185.  
  186. Does anybody know where I can find details on the GPS Satellites.
  187.  
  188. In particular, as I use a GPS receiver on an aircraft, I would like to
  189. know in advance how many satellites  are in sight in a particular 
  190. moment in a particular place.
  191. Also I am interested in knowing the future plans for GPS and  when
  192. new satellites will be placed in orbit.
  193.  
  194. Thank you very much to anyone who can help me.
  195.  
  196. GIANNI PICCOLI   TORINO-ITALY
  197. (Internet  mc1275@mclink.it)
  198.  
  199. ------------------------------
  200.  
  201. Date: 3 Feb 93 15:25:26 GMT
  202. From: Tom Glinos <tg@cs.toronto.edu>
  203. Subject: IRAS - 10 Years Ago
  204. Newsgroups: sci.space,sci.astro,alt.sci.planetary
  205.  
  206. In article <93033.204827GMS@psuvm.psu.edu> Gerry Santoro - CAC/PSU <GMS@psuvm.psu.edu> writes:
  207. >W/r the anniversery of  IRAS ......
  208. >
  209. >Does anyone else remember the comet IRAS-Aracki-Alcock?  (sp?)
  210.  
  211. I was in Tuscon the evening of closest approach.
  212. I watched it travel the sky in "real-time" through a 16" scope.
  213. It was wonderful.
  214. -- 
  215. =================
  216. Prediction, 1993, Year the UNIX        | Tom Glinos @ U of Toronto Statistics
  217. industry collapsed            | tg@utstat.toronto.edu
  218.  
  219. ------------------------------
  220.  
  221. Date: Wed, 3 Feb 1993 15:22:23 GMT
  222. From: hathaway@stsci.edu
  223. Subject: IRAS - 10 Years Ago
  224. Newsgroups: sci.space,sci.astro
  225.  
  226. In article <93033.204827GMS@psuvm.psu.edu>, Gerry Santoro - CAC/PSU <GMS@psuvm.psu.edu> writes:
  227. > W/r the anniversery of  IRAS ......
  228. > Does anyone else remember the comet IRAS-Aracki-Alcock?  (sp?)
  229. > I was living in suburban Pittsburgh at the time and took my 8" scope
  230. > out to the observing site of the Amateur Astronomer Association
  231. > of Pittsburgh to really see the comet.
  232. > As I recall, it was almost full-moon size and simply a ghostly round
  233. > object.  It moved *real* fast -- covering most of the sky in only 4 days!
  234. > I even  managed to get my father and lots of neighbors  to make the
  235. > trip out from light-polluted skies to watch it.  An accomplishment
  236. > in itself!
  237. > I've seen many comets -- but that is one I will never forget!
  238. > gerry santoro  (gms@psuvm.psu.edu)                            |
  239. > academic computing/speech communication                     -(*)-
  240. > penn state university                                  .....  |  .....
  241.  
  242. Yes!!! - I followed it for a week from when it was Draco, around the pole, 
  243. and into the sunset.  It was clear every night and I got lots of good 
  244. looks at it, including some real-time motion as it passed very close 
  245. to some stars.  In a very few minutes, you could see its position shift. 
  246. Most impressive.  I had a yard full of viewers one night.  (And I 
  247. met a very impressive lady that same week, with whom I subsequently 
  248. carried on a long association - I remember the two together.)  Many 
  249. memories of that long-ago spring. 
  250.  
  251. Wm. Hathaway 
  252. STScI, Baltimore, MD 
  253.  
  254. ------------------------------
  255.  
  256. Date: 3 Feb 1993 16:39:02 GMT
  257. From: Hakan Kayal <hakiaahb@w250zrz.zrz.tu-berlin.de>
  258. Subject: material properties of alu 2219
  259. Newsgroups: sci.space
  260.  
  261.  I am looking for material properties of aluminum 2219.
  262. Does somebody know obout it or can give me some references .
  263. Thank you
  264.  
  265. ------------------------------
  266.  
  267. Date: 3 Feb 93 07:02:28 EST
  268. From: Chris Jones <clj@ksr.com>
  269. Subject: Polar Orbit
  270. Newsgroups: sci.space
  271.  
  272. In article <1993Feb2.235514.1@acad3.alaska.edu>, nsmca@acad3 writes:
  273. >Why does the US launch polar orbit missions from Vandenburg? other than for
  274. >military missions? I wonder is they know about Poker Flats here in Alaska
  275. >which has many of the same benfits as Vandenburg (open spaces) but nicely is
  276. >near the pole..
  277.  
  278. As I said yesterday (in <21681@ksr.com>), for polar orbit the latitude of the
  279. launch site doesn't matter (except that a launch site at either pole would have
  280. lots of longitude lines along which to launch in order to achieve polar orbit).
  281. I expect Vandenburg is easier to reach than Poker Flats (lessening transport
  282. costs to the the site and operating costs of the site), and has the advantage
  283. of already having the infrastructure for launching satellites (along with over
  284. 30 years' experience).  I don't know specifically why it was chosen, but it
  285. seems a reasonable guess that the US looked for a suitable site from a range
  286. safety point of view which was already secure (since spy satellites were often
  287. placed into polar orbits).
  288. --
  289. Chris Jones    clj@ksr.com
  290.  
  291. ------------------------------
  292.  
  293. Date: Wed, 3 Feb 1993 15:38:01 GMT
  294. From: Bruce Dunn <Bruce_Dunn@mindlink.bc.ca>
  295. Subject: Space Station Media Handbook - 7/18
  296. Newsgroups: sci.space
  297.  
  298. From NASA SPACELINK:
  299.  
  300. "6_10_2_5_5.TXT" (21701 bytes) was created on 10-15-92
  301.  
  302.  
  303. Program Description
  304.  
  305. Program Phases
  306.  
  307. Phase A
  308. Concept Phase (Requirements & Architecture) from Authorization of
  309. the SSTF (5/82) to Award of the Phase B Contracts (4/85)
  310.  
  311. Concepts for a space station go back to the last century. Within NASA,
  312. conceptual studies and workshops go back to the early 1960s. The
  313. 1972 decision to develop the Shuttle first delayed the Space Station
  314. Program until May of 1982, when NASA Administrator James Beggs
  315. authorized the Space Station Task Force (SSTF). In addition to
  316. organizing a new project and office, the SSTF conducted three major
  317. activities: 1) A major effort to define realistic missions that were
  318. enabled by or materially benefited from the permanent presence of
  319. humans in space. 2) Definition studies to define system requirements
  320. and interfaces, supporting systems and trade studies, a preliminary
  321. system design and detailed plans for the development phase. And 3)
  322. advanced development activities. From August 1982 to April 1983,
  323. NASA funded the studies called "Space Station Needs, Attributes and
  324. Architectural Options." In addition, a Mission Requirements Working
  325. Group was established to direct the industry studies and to integrate
  326. in-house activities and special studies such as the Space Science
  327. Board and Space Applications Board studies. This group was
  328. supported by three Mission Area Panels: 1) Science and Applications;
  329. 2) Commercial; and 3) Technology Development. The Working Group
  330. also maintained liaison with the international community which
  331. performed similar studies. Using the results of these studies and
  332. input from the various groups, NASA briefed the President and
  333. Cabinet in December 1983. In January 1984 the President directed
  334. NASA to build the space station within a decade.
  335.  
  336. 1984 was the year for formulating the overall NASA management
  337. structure, reviewing requirements, conducting independent user and
  338. science community assessments and developing a reference
  339. configuration that the Phase B contractors could bid against.
  340. President Reagan reaffirmed the Space Station Program in the
  341. January 1985 State of the Union address. The first half of 1985
  342. involved obtaining international participation and commitment for
  343. the program.
  344.  
  345. Phase B
  346. Definition and Preliminary Design Phase from Award of Phase B
  347. Contracts (4/85) to Award of Phase C/D Contracts (12/87)
  348.  
  349. In April of 1985, Phase B commenced with the four NASA Work
  350. Package Centers each awarding parallel definition contracts for their
  351. respective responsibilities. The eight definition contractors defined
  352. the system requirements, developed supporting technologies and
  353. technology-development plans, performed supporting systems and
  354. trade studies, developed preliminary designs, and defined system
  355. interfaces and developed plans, cost estimates, and schedules for the
  356. Phase C/D activities.
  357.  
  358. The Phase B definition studies were initiated in April 1985 and
  359. ended in January 1987. The contracts were awarded to the following:
  360.  
  361. *       MSFC (Work Package 1): Boeing Aerospace, Martin Marietta
  362. *       JSC (Work Package 2): McDonnell Douglas, Rockwell
  363. International
  364. *       GSFC (Work Package 3): General Electric and RCA
  365. *       LeRC (Work Package 4): Rocketdyne, TRW
  366.  
  367. The results of the definition studies were synthesized and integrated
  368. into the Phase C/D Requests for Proposals (RFPs) released by each
  369. Work Package Center in April 1987.
  370.  
  371. Also in the spring of 1985, NASA signed bilateral memoranda of
  372. understanding (MOUs) with Canada, ESA and Japan that provided a
  373. framework for cooperation on the space station during Phase B.
  374. The user requirements were being reviewed and refined by various
  375. groups, committees and workshops. The results updated the Mission
  376. Requirements Data Base, and in June 1985, the "Functional
  377. Requirements Envelope" was established to augment the Phase B
  378. RFPs.
  379.  
  380. By March 1986, the program reached a major milestone called the
  381. Systems Requirements Review (SRR) a traditional programmatic
  382. point that marks the point where the basic characteristics of the
  383. space station have been decided. This SRR process focused on
  384. technical decisions that, in May of 1986, established the baseline
  385. configuration called the "Dual Keel."
  386.  
  387. As a result of the Challenger accident in January of 1986, NASA went
  388. through an exhaustive evaluation period during which, among other
  389. Shuttle topics, management of major programs, such as space station,
  390. was examined. The NASA Management Study, led by ex-Apollo
  391. Program Manager General Samuel Phillips, made management,
  392. programmatic and organizational recommendations, many of which
  393. were implemented. Among these was the establishment of three
  394. levels of management: 1) the Headquarters Office of Space Station; 2)
  395. the Space Station Program Office, later located in Reston, Virginia;
  396. and 3) individual Space Station Project Offices at those NASA Centers
  397. primarily involved with the program. The space station work was
  398. then allocated to those Centers in "Work Packages" that reflected the
  399. Center's expertise. In effect, this was a shift from the former "Lead
  400. Center" concept to a Level II program office located at Headquarters.
  401. In August and September 1986, the program was subjected to an
  402. intense review by a specially constituted Critical Evaluation Task
  403. Force (CETF) which reaffirmed the soundness of the Dual Keel
  404. baseline configuration established at the SRR, but added resource
  405. nodes at the end of the Laboratory and Habitation Modules and
  406. revised the assembly sequence accordingly.
  407.  
  408. Meanwhile, the Operations Task Force was organized to focus
  409. operations planning by conducting a systematic assessment of station
  410. operations. This major effort produced a report that considered
  411. various options for achieving operations goals.
  412.  
  413. In 1987, a number of reviews by various independent groups and
  414. committees including the National Research Council (NRC) were
  415. conducted. The NRC, chaired by ex-NASA Administrator Dr. Robert
  416. Seamans, concluded in September that the program was a formidable
  417. challenge to NASA as the architect and program manager, but the
  418. commitment to the space station is, and must be, national in
  419. character. The NRC also endorsed the revised baseline configuration
  420. (what is now called Space Station Freedom) and stated that the
  421. nation's long-term goals in space should be clarified before
  422. committing to the evolutionary Block 2, or "Dual Keel" configuration.
  423. In September 1987 the Space Station Science Operations Study Team
  424. examined science opportunities, operations, planning and
  425. management and concluded with a set of effective recommendations
  426. that were considered for Phase C work.
  427.  
  428. That year, 1987, was also a significant procurement period for the
  429. program. In addition to the four Work Packages, three separate,
  430. competitive procurements were conducted to support detailed design
  431. and development. The contracts awarded in 1987 are listed on page
  432. 20.
  433.  
  434. The contracts awarded in December were for Phase C and D. With
  435. these contracts in place, Phase B ended and Phase C - Detailed Design
  436. began.
  437.  
  438.  
  439. Phase C
  440. Detailed Design from the Award of Phase C/D Contracts (12/87) to
  441. the Critical Design Review (1992)
  442.  
  443. Although many people use the term "Phase C/D," meaning both the
  444. design (C) and development (D) phases together, they are really two
  445. separate and distinct activities. The term C/D is used primarily
  446. because the same contractor generally does both the design and
  447. development including the manufacturing. Therefore, the contracts
  448. for these two major groups of activities are typically awarded
  449. together. However, in classical systems engineering, the detailed
  450. design takes the results of Phase B to the point of preparing detailed
  451. engineering drawings and specifications for hardware and software,
  452. which are design activities. However, nothing is actually built in
  453. Phase C except perhaps some test or prototype articles. Once the
  454. design passes a Critical Design Review, the design is "frozen" and
  455. handed off to the development Phase D where actual manufacturing
  456. begins.
  457.  
  458. Due to adjustments in funding levels, analysis of program costs and
  459. adjustments in contractor work, schedules and responsibilities, the
  460. design phase got off to a busy start. The major engineering activity
  461. for 1988 was the Program Requirements Review (PRR) which
  462. proceeded on schedule. The PRR provides a critical review and
  463. assessment of the Level I requirements stated in the Program
  464. Requirements Document (PRD), and necessary Level III requirements
  465. to assure complete and consistent specification of program
  466. requirements.
  467.  
  468. The Level I Office of Space Station review was completed in May
  469. 1988; the Level II Space Station Program Office review was
  470. completed in June 1988; and the Level III Work Package Centers
  471. review was completed in November 1988. Also, 1988 was the year
  472. for finalizing the details of the Work Package prime contractors once
  473. the program funding levels were made and money was appropriated.
  474. This allowed prime contractors to determine when they could get
  475. their subcontractors onboard and begin staffing up for their work
  476. assignments.
  477.  
  478. During the last half of 1988, the negotiations of international
  479. agreements regarding Phase C/D/E were completed and the
  480. agreements were signed on September 29, 1988, the same day as the
  481. STS-26 launch. This event culminated the efforts of the international
  482. partners and the U.S. to determine how they would work together to
  483. develop and operate Space Station Freedom. Various committees and
  484. workshops occurred during 1988 to continue the review of
  485. requirements from all disciplines, including the sciences, advanced
  486. technology and commercialization opportunities. Another 1988
  487. activity involved a major effort to determine the optimum launch
  488. and assembly sequence to provide an earlier man-tended capability.
  489. 1988 was also filled with preparation of reports required by
  490. Congress on various topics. Major reports were delivered at the
  491. average rate of one per month.
  492.  
  493. Phase C activities concluded in the fall and winter of 1988 included
  494. fulfillment of the required staffing, facility construction planning,
  495. development of an associate contractor relationship that would
  496. simplify the program integration process and release of two more
  497. Requests for Proposals (RFPs); one on the Test Control and Monitor
  498. System (TCMS) in September and one for the Flight Telerobotic
  499. Servicer in November.
  500.  
  501. During 1989, the program was faced with severe budget cuts. A
  502. Configuration Budget Review (CBR) Team was formed in July to
  503. develop preliminary options for presentation to space station
  504. management and the international partners. Three separate Level
  505. I/II Control Boards were convened to analyze the options and
  506. recommendations. These three Control Boards were held in August,
  507. September and October 1989. The results of this "rephasing" were
  508. briefed to Congress and were implemented by changes to the
  509. Program Requirements Document. These results maintained the first
  510. element launch in March 1995, but delayed the assembly/complete
  511. milestone 18 months, while making some significant system and
  512. subsystem changes. The CBR kept the station element design
  513. essentially the same.
  514.  
  515. In January 1990, the External Maintenance Task Team (EMTT) was
  516. formed to address concerns regarding the amount of extravehicular
  517. activity (EVA) required to maintain the station. The EMTT was co-
  518. chaired by Dr. William F. Fisher, astronaut, and Mr. Charles Price,
  519. Chief of the Robotics Systems Development Branch at NASA's Johnson
  520. Space Center. They were given the authority to review all aspects of
  521. Space Station Freedom external maintenance and repair. They
  522. conducted a seven-month investigation, concluding that about 3,200
  523. hours of EVA, annually, would be needed to maintain the station, but
  524. made several recommendations which, if implemented, could reduce
  525. EVA to 500 hours annually.
  526.  
  527. To address the findings and recommendations of the EMTT, a
  528. complementary program-wide team was formed in June 1990 called
  529. the External Maintenance Solutions Team (EMST). The EMST was
  530. chaired by Dr. William E. Simon of JSC and was chartered to develop
  531. solutions to the problems regarding Space Station Freedom external
  532. maintenance identified by the EMTT.  The EMST's two-month study
  533. concluded that about 3,500 hours of EVA would be required annually,
  534. but this could be reduced to about 485 hours by implementing their
  535. solutions.
  536.  
  537. In June 1990, the Level II Resources "Turbo Team" was formed to reduce
  538. the weight of the station and the housekeeping power requirements.
  539.  
  540. Throughout 1990, Preliminary Design Reviews (PDR's) were held.  In all,
  541. over 80 separate design reviews were conducted during the year.  The
  542. preliminary design of nearly every major component, subsystem and system
  543. was reviewed.  This culminated with the Integrated System PDR (ISPDR)
  544. in November-December of 1990.  This resulted in a baseline station
  545. design whidch was accepted by all program participants.
  546.  
  547. A 1991 fiscal year budget shortfall of more than $550 mission, along
  548. with Congressional direction to significantly reduce out-year
  549. spending, prompted NASA to initiate an assessment of the Space
  550. Station Freedom Program.  This effort, known as restructuring, was
  551. initiated in October 1990 and culminated with a report to Congress
  552. in March 1991.
  553.  
  554. The Advisory Committee on the Future of the U.S. Space Program (the
  555. Augustine Committee) made several recommendations pertaining the
  556. Space Station Freedom in its December 1990 Report.
  557.  
  558. As a result of these reviews and recommendations, Space Station Freedom
  559. was extensively redesigned.  The new design is cheaper, smaller, easier
  560. to assemble in orbit and will require fewer Shuttle flights to build.
  561.  
  562. The U.S. Laboratory and Habitation Modules are 40 percent shorter
  563. and can be outfitted and verified on the ground.  The truss is now
  564. pre-integrated and can be tested with all subsystems before launch.
  565. This significantly reduces EVA time needed to build and maintain
  566. the station.
  567.  
  568. During November 1991, the Man-tended Configuration Preliminary Design
  569. Review was conducted.  This review focused on the major programmatic
  570. interfaces between the three different work packages, the International
  571. Partners and the station's hardware and software elements.  This major
  572. milestone confirmed the validity and maturity of the design and was a
  573. complete program success.
  574.  
  575. Phase D
  576. Development (Manufacturing) after Critical Design Review (1993)
  577.  
  578. The development phase will be accomplished in four steps:  1) equipment
  579. manufacture, test, and qualification; 2) integration of all equipment
  580. in a central facility for integration, test, and verification; 3)
  581. software integration and certification; and 4) launch package integration.
  582. The manufacture of the various components of the space station will begin
  583. following the Critical Design Review.
  584.  
  585. The flight elements are vital parts of an orbital complex that must
  586. provide safe and usable operational environment over the long term.
  587. They will be designed, developed, fabricated and assembled in high
  588. quality aerospace development centers by experienced people following
  589. proven procedures.  Many of these centers and personnel have experience
  590. with the Shuttle or Apollo programs.  Existing capital equipment, tooling
  591. and production test equipment will be utilized extensively to minimize
  592. costs.  Standard manufacturing processes will be employed to assume a
  593. dependable, high quality product.
  594.  
  595. The manufacturing of equipment will be performed at various locations.
  596. For example, the modules will be manufactured in Huntsville, Alabama;
  597. the truss assembly is Huntington Beach, California; and the power
  598. supply in Canoga Park, California.
  599.  
  600. The Laboratory Module, for example, comprises several subsystems.
  601. The structure includes thepressure shell assembly, hatches
  602. and racks that will be used to house experiments, payloads and
  603. consumables.  The Environmental Control and Life Support System
  604. (ECLSS), the Thermal Control System (TCS), Electrical Power System
  605. (EPS), Audio and Video Systems and Data Management System (DMS) are
  606. also subsystems of the Laboratory Module.  Some of these components
  607. will be manufactured by Boeing's subcontractors and other work package
  608. contractors at various locations throughout the U.S.  These components,
  609. together with those built by Boeing at Huntsville, will be assembled
  610. into the U.S. Laboratory.  The assembly and acceptance testing
  611. of the U.S. Lab, as with the Habitation Module and Logistics Elements,
  612. will take place in Huntsville.  Unlike other space programs where
  613. the total spacecract is assembled on the ground, assembly of space
  614. station elements must occur on-orbit and will, therefore, require
  615. training of astronaut crews in near-zero gravity conditions to practice
  616. performing the delicate and complex assembly maneuvers safely and
  617. efficiently.  Such training will be perfomed in large water immersion
  618. facilities such as the Neutral Buoyancy Laboratory at JSC and at
  619. a similar facility at MSFC.  The astronauts will be working under
  620. water with structural mockups of flight hardware that will simulate
  621. their spatial mass and inertia characteristics to gain experience
  622. in handling these elements prior to on-orbit actual assembly.
  623.  
  624. Prior to launch, all elements are sent to the Space Station
  625. Processing Facility (SSPF) at Kennedy Space Center (KSC).
  626. Here, the launch packages are assembled and thoroughly tested.
  627. Tests are performed to verify that flight software and hardware
  628. are compatible and correctly installed.
  629.  
  630. The program development has distinct phases.  The initial phase calls
  631. for the first element launch to occur in the first quarter of 1996.
  632. Man-tended capability (MTC) will be met in the second quarter of
  633. 1997.  The MTC phase culminates with the permanently manned capability
  634. (PMC) of the station with at least a 4-person crew in 2000.   Seventeen
  635. Shuttle flights with four Advanced Solid Rocket Motors (ASRM) flights
  636. will be needed to complete the initial phase.  On the eighteenth
  637. flight, the centrifuge will be added.  An Assured Crew Return Vehicle
  638. (ACRV), capable of returning space station crew members to Earth
  639. in an emergency, will be in place prior to permanent staffing of the
  640. station.  During the initial phase substantial accomodations will
  641. be available to microgravity materials and life sciences
  642. researchers.
  643.  
  644. The Follow-on Phase will result in further enhancements consistant with
  645. national policy.
  646.  
  647. Phase E
  648. Operations (Overlaps Phase D) from First Element Launch 1996 to End of Life
  649.  
  650. Six Shuttle flights will be needed for station assembly to achieve MTC.
  651. Following MTC, four Shuttle flights per year are scheduled for station
  652. assembly and maintenance.  There also will be three utilization
  653. flights per year during MTC operations.  During these utilization
  654. flights, the Shuttle will dock at the station for 13 days or more.  A
  655. crew of up to seven will be onboard the Shuttle.  Four of the crew will
  656. devote their time to support space station user activities.  During
  657. this period experiments requiring human intervention will be
  658. conducted.  Experiments that require quiescent operation for an
  659. extended period can be left onboard the station to operate while the
  660. station is unattended.  The crew will have been trained in the
  661. handling of the experiments and their results.
  662.  
  663. Following PMC the station will be permanently staffed by at least a
  664. four person crew, two of whom will be dedicated to supporting space
  665. station user activities.
  666.  
  667. Planning for the space station operations and utilization is designed
  668. to maximize the use of onboard resources.  Operations planning for
  669. the long, medium and short range is centrally managed to account for
  670. system user demands, ensuring an integrated schedule is available at
  671. each stage of payload development, checkout and flight.  Below this
  672. level, detailed planning is distributed to the actual users and to
  673. operators of the space station.  This arrangement provides these
  674. groups with the flexibility to meet rapidly changing conditions
  675. and to accommodate unexpected payload research opportunities.
  676.  
  677. The Space Station Control Center (SSCC) at the Johnson Space Center
  678. will perform station systems management and interact with a Payload
  679. Operations Integration Center (POIC) at the Marshall Space Flight
  680. Center, which will work with users either individually or through
  681. user-provided operations centers.  Predefined allocations will
  682. govern distribution of available resources among both U.S. and
  683. international users of the manned base.  An execution plan for
  684. payload operations will provide for experiments the crew will conduct,
  685. autonomous experiments and those operated remotely via the station's
  686. information system by investigators in laboratories on Earth.
  687. Experiment scheduling will be according to requirements for resources
  688. such as crew time and power.
  689.  
  690. Payload integration also will use a distributed operations concept.
  691. Users will be able to integrate their experiments into racks and
  692. onto pallets at multiple user-operated sites certified by NASA.
  693. These sites will allow users to check payload hardware and software
  694. interfaces for proper operation before the payloads are transported
  695. to the launch site.
  696.  
  697. Logistics operations for the manned base will be concentrated at KSC.
  698. With the space station in orbit for at least 30 years, maintenance
  699. and servicing will be performed routinely.  Station design provides
  700. for Orbital Replacement Units (ORU's), which a crewmember can remove
  701. and replace inside the pressurized volume, or by robots or EVA for
  702. externally mounted payloads.  Critical replacements units will be
  703. stored onboard, and others will be on the ground ready for transport
  704. in logistics elements as needed.
  705.  
  706.  
  707. The material above is one of many files from SPACELINK
  708. A Space-Related Informational Database
  709. Provided by the NASA Educational Affairs Division
  710. Operated by the Marshall Space Flight Center
  711. On a Data General ECLIPSE MV7800 Minicomputer
  712.  
  713. SPACELINK may be contacted in three ways:
  714.  
  715. 1) Using a modem, by phone at 205-895-0028
  716.  
  717. 2) Using Telnet, at spacelink.msfc.nasa.gov
  718.  
  719. 3) Using FTP capability. Username is anonymous and Password is guest.
  720. Address is 192.149.89.61.
  721.  
  722.  
  723. --
  724. Bruce Dunn    Vancouver, Canada   Bruce_Dunn@mindlink.bc.ca
  725.  
  726. ------------------------------
  727.  
  728. Date: Wed, 3 Feb 1993 15:19:00 GMT
  729. From: Mark Brown <mbrown@testsys.austin.ibm.com>
  730. Subject: Today in 1986-Remember the Challenger
  731. Newsgroups: sci.space,sci.space.shuttle
  732.  
  733. | jfw@ksr.com (John F. Woods) writes:
  734. |The Challenger accident deeply affected people who never met the
  735. |astronauts, *tens of millions of people*, people who didn't forget
  736. |about it after the reporters left the Cape.  To those who believe that
  737. |the drive to explore is an important part of the human spirit, space
  738. |exploration certainly qualifies as a significant struggle.  In
  739. |addition to the obvious profound unhappiness associated with the
  740. |event, it nearly resulted in shutting down the entire space program,
  741. |a great example of ruin and a potential tragedy in its own right.
  742. |In literature, tragedies are not distinguished by the body count, but
  743. |by the context and results.
  744.  
  745. I was working at TI when it happened; what I remember most was a comment
  746. from our department head, an Old Timer named Moize Adney:
  747.  
  748. "Well, let's get up there and try again".
  749.  
  750. We almost didn't. I'm glad we did.
  751. -- 
  752. Mark Brown       IBM PSP Austin, TX.| Fear the Government
  753. (512) 838-3926   VNET: MBROWN@AUSVMQ| that fears your privacy.
  754. MAIL: mbrown@testsys.austin.ibm.com | Keep personal cryptography legal.
  755.        DISCLAIMER: My views are independent of IBM official policy.
  756.  
  757. ------------------------------
  758.  